Română
Русский
English
Română
Русский

Estate Tower

str. Ismail 31
Blocks
1
Apartments
270
Finished

Estate Tower

str. Ismail 31
Blocks
1
Apartments
270
Complex located right in the heart of the capital, strategically placed in the most dynamic urban area, at the intersection of Ștefan Cel Mare Boulevard and Ismail street. Estate Tower is the project that precisely reflects the spirit of a developed city, modern architecture, commercial spaces on the ground floor and penthouses with terraces with superb views on the top floor.
Estate Tower
Strategic location

Panoramic windows open one of the most beautiful views of Chisinau

The location of the complex allows Estate Towers to constantly remain an attractive project for both investors and those who want a home that meets all the requirements of a life in constant motion. The project consists of two blocks with 10 levels each, using advanced technologies and durable and environmentally friendly materials. With reinforced concrete monolithic shell, ventilated facade and Low-E glazing that ensures energy efficiency (less heat loss when heating in winter and reduces UV rays in the warm season). Three European lifts, granite hallways, efficient lighting and ventilation in the blocks. The apartments have high performance boilers. The courtyard located on the first floor has spots to relax and also a playground. Underground and outdoor parking.
Available floor plans

Study the available floor plans and choose the right one for you

Discover the available floor plans and choose the perfect apartment for you. Each floor plan is designed to provide comfort, functionality, and optimal space, reflecting your needs and preferences. Choose the floor plan that best represents you and start turning your dream into reality.
Construction progress

Complex 100% completed and put into operation

Estate Tower is a shining example of the efficiency and professionalism of Estate Invest Company in the field of construction. The project started on February 20, 2018 and was quickly completed on November 25, 2019. This imposing building is proof of the commitment to quality and speed.

April 2024